Commisioned by Water2Energy, Marine Systems designed and built a lifting frame. Water2Energy is building a tidal turbine, which will be installed in Vlissingen in June 2021. This 20 tons lifting frame will be used to lift the tidal turbine during maintenance.
Besides this lifting frame, Marine Systems has built parts of the tidal turbine, like the hood and the guide rail.
This project is made possible by Interreg 2Seas Encore and the province of Zeeland.